PREMIUM
Water

Murray weir works planned

Water works: The last time works were conducted to replace trestles at the Mildura Weir was in 2016. Photo: Goulburn-Murray Water

The Murray River level in the Mildura Weir pool will be gradually lowered and Lock 11 closed for three weeks from June 20 for overdue maintenance works.

Hold tight - we’re checking permissions before loading more content